29.04.2008, 15:07
Howdy folks!
I'm back from visiting my folks in Connecticut and spent the previous week moving my 800ft^2 downstairs into storage units a stationwagon full at a time (read: SLOWLY). Came back to find that instead of just a demo on my downstairs, they started roughing in the new plumbing. Problem is that this week was supposed to be an "evaluate the situation" week in the flowchart. Some plubling needs to be moved, now. Least they didn't pour the concrete to level the floor yet.
I'm trying to make a hole for my PC's temporary spot this evening, meanwhile, I'm on the laptop.
tater
I'm back from visiting my folks in Connecticut and spent the previous week moving my 800ft^2 downstairs into storage units a stationwagon full at a time (read: SLOWLY). Came back to find that instead of just a demo on my downstairs, they started roughing in the new plumbing. Problem is that this week was supposed to be an "evaluate the situation" week in the flowchart. Some plubling needs to be moved, now. Least they didn't pour the concrete to level the floor yet.
I'm trying to make a hole for my PC's temporary spot this evening, meanwhile, I'm on the laptop.
tater