17.11.2008, 16:17
TOUR TWO & THREE: Will be back under construction after the completion of the FEAF Campaign "Just an Eyelash" that I am nearly finished with and now playtesting for the Philippines Map!
Maybe I can get Tour Two out by X-mas, The VMF-213 Hellhawks Campaign takes much longer to build because I am following Diaries, and After Action Reports to make Everything as Identical to what had actually happened as possible.
(Note: FEAF almost as big as all Three Tours, Done in 2 months, whereas this as been a WIP since the Slot Map Release)
Maybe I can get Tour Two out by X-mas, The VMF-213 Hellhawks Campaign takes much longer to build because I am following Diaries, and After Action Reports to make Everything as Identical to what had actually happened as possible.
(Note: FEAF almost as big as all Three Tours, Done in 2 months, whereas this as been a WIP since the Slot Map Release)